Subsea and salvage
Site operations for wreck removal and ship cutting.
Wreck removal
Wreck removal starts with an assessment of the vessel or structure and its surroundings. Water depth, position and access conditions inform the definition of the work scope and equipment requirements.
Ship cutting
Ship cutting is planned according to the vessel condition, work site and agreed scope. The treatment of individual sections, work sequence and site handling arrangements are considered before execution.
Operational preparation
Available photographs, dimensions and site information support the initial assessment. The execution method is developed as site conditions and work requirements become clear, with coordination of other activities in the work area.